# Headroom - Project Charter & Specifications
**Version:** 1.0
**Date:** February 17, 2026
**Status:** Approved for Development
---
## Executive Summary
**Headroom** is a resource planning and capacity management tool designed to solve the allocation chaos faced by engineering managers juggling multiple projects and team members. It replaces error-prone spreadsheets with a structured system that tracks capacity, forecasts utilization, prevents over/under-billing, and provides clear visibility into team allocation.
**Target Users:**
- Engineering managers (10-15 person teams)
- Managing 10-12 concurrent projects in various stages
- Need month-by-month capacity planning and allocation tracking
**Core Value Proposition:**
- Know exactly who has headroom for new work
- Prevent billing errors (over-allocation → overcharge, under-allocation → undercharge)
- Forecast revenue based on approved estimates and current allocations
- Track planned vs actual hours to understand team utilization
---
## Problem Statement
### Current Pain Points
**The Spreadsheet Nightmare:**
- Manual capacity calculations across holidays, PTO, weekends
- No validation (easy to over-allocate people or projects)
- Hard to see at a glance: "Who has capacity this month?"
- Billing forecasts require manual formula updates
- No audit trail of allocation changes
- Difficult to track planned vs actual hours
**Business Impact:**
- **Over-allocation:** Leads to overcharging clients → escalations, unhappy customers
- **Under-allocation:** Leads to undercharging → revenue loss, unhappy management
- **Resource conflicts:** Multiple managers allocating the same person without visibility
- **Forecast inaccuracy:** Can't reliably predict revenue or capacity needs
---
## Solution Overview
Headroom provides a structured workflow for capacity planning and resource allocation:
```
┌─────────────────────────────────────────────────────────────────┐
│ MONTHLY CAPACITY PLANNING CYCLE │
├─────────────────────────────────────────────────────────────────┤
│ │
│ STEP 1: CAPACITY PLANNING │
│ ──────────────────────────────────────────────────── │
│ • Define team members (name, role, hourly rate) │
│ • Mark holidays, PTO, weekends for the month │
│ • Set availability per day (1=full, 0.5=half, 0=unavailable)│
│ │
│ OUTPUT: │
│ • Individual capacity (person-days per month) │
│ • Team capacity (total available person-days) │
│ • Possible revenue (capacity × hourly rates) │
│ │
├─────────────────────────────────────────────────────────────────┤
│ STEP 2: PROJECT SETUP │
│ ──────────────────────────────────────────────────── │
│ • Track project status (Initial → Estimates → Funded → ...) │
│ • Define approved estimate (total billable hours) │
│ • Forecast effort distribution across months │
│ │
│ OUTPUT: │
│ • Month-wise project forecast │
│ • Alerts when forecast ≠ approved estimate │
│ │
├─────────────────────────────────────────────────────────────────┤
│ STEP 3: RESOURCE ALLOCATION │
│ ────────────────────────────────────────────────────────────│
│ • Allocate hours per person per project per month │
│ • Validation: total allocation ≤ team capacity │
│ • Validation: project allocation = approved estimate │
│ • "Untracked" bucket for external team time │
│ │
│ OUTPUT: │
│ • Clear view: who's allocated to what │
│ • Over/under allocation indicators (RED flags) │
│ • Running utilization % per person │
│ │
├─────────────────────────────────────────────────────────────────┤
│ STEP 4: ACTUALS TRACKING │
│ ────────────────────────────────────────────────────────────│
│ • Team members log hours worked (monthly aggregate) │
│ • Manual entry (no time-tracking tool integration for MVP) │
│ │
│ OUTPUT: │
│ • Running utilization (allocated vs capacity YTD) │
│ • Overall utilization (allocated % per month) │
│ • Variance: planned vs actual │
│ │
└─────────────────────────────────────────────────────────────────┘
```
---
## Complete Requirements
### 1. Capacity Planning
**Inputs:**
- Team member list (name, role/team, hourly rate)
- Calendar data per month (holidays, weekends)
- Individual PTO requests
- Daily availability (1.0 = full day, 0.5 = half day, 0 = unavailable)
**Calculations:**
- Individual capacity = Σ(working days × availability)
- Team capacity = Σ(individual capacities)
- Possible revenue = Σ(individual capacity × hourly rate)
**Outputs:**
- Individual capacity report (person-days per month)
- Team capacity summary
- Revenue potential (if fully utilized)
**Validation Rules:**
- Availability must be 0, 0.5, or 1.0
- Hourly rate must be > 0
- Working days must exclude holidays, weekends, PTO
---
### 2. Project Management
**Project Attributes:**
- Project ID (unique identifier)
- Project title
- Type: Project (billable) / Support (ongoing ops)
- Status (see state machine below)
- Approved estimate (total billable hours)
- Forecasted effort (month-by-month breakdown)
**Project Status State Machine:**
```
NA/Support → Initial → Gathering Estimates → Estimate Pending Approval
Estimate Rework ←───────┘
Estimate Approved → Funded → Scheduled → In-Progress
Ready for Prod → Done
[Optional: On-Hold, Cancelled]
```
**Outputs:**
- Month-wise forecast per project
- Alert when Σ(forecasted effort) ≠ approved estimate (RED flag)
- Alert when monthly team allocation > team capacity (RED flag)
**Validation Rules:**
- Approved estimate must be > 0
- Forecasted effort sum must equal approved estimate (±tolerance)
- Cannot allocate hours to projects in status "Done" or "Cancelled"
---
### 3. Resource Allocation
**Allocation Matrix:**
```
For selected month M:
┌────────────────────────────────────────────────────┐
│ Project │ Dev A │ Dev B │ Dev C │ Untracked │ │
├────────────┼───────┼───────┼───────┼───────────┼──┤
│ Project X │ 40h │ 20h │ 0 │ 10h │ │
│ Project Y │ 20h │ 40h │ 30h │ 0 │ │
│ Project Z │ 0 │ 80h │ 60h │ 0 │ │
├────────────┼───────┼───────┼───────┼───────────┼──┤
│ Total │ 60h │ 140h │ 90h │ 10h │ │
│ Capacity │ 160h │ 160h │ 120h │ ∞ │ │
│ % Util │ 38% │ 88% │ 75% │ N/A │ │
└────────────────────────────────────────────────────┘
```
**Features:**
- Allocate hours per person per project per month
- "Untracked" resource for external team time (no billing tracked)
- Visual indicators:
- GREEN: Allocation = Approved estimate (100%)
- YELLOW: Under-allocated (< 100%)
- RED: Over-allocated (> 100%)
**Outputs:**
- Allocation summary per month
- Per-project allocation % (allocated / approved estimate)
- Per-person utilization % (allocated / capacity)
- Over/under allocation flags
**Validation Rules:**
- Cannot allocate negative hours
- Cannot allocate more than person's monthly capacity (warning, not hard block)
- Cannot allocate to non-existent project or person
- Sum of project allocations should equal approved estimate (tolerance: ±5%)
---
### 4. Actuals & Utilization Tracking
**Data Entry:**
- Team members log hours worked per project per month
- Entry method: Manual (monthly aggregate)
- Updates: Can be incremental (weekly updates accumulate)
**Calculations:**
- **Running utilization:** (Allocated hours YTD) / (Capacity YTD) × 100%
- **Overall utilization:** (Allocated hours this month) / (Capacity this month) × 100%
- **Variance:** Actual hours - Allocated hours (per project, per person)
**Outputs:**
- Actuals vs Planned comparison
- Utilization metrics (running, overall)
- Variance reports (where did we over/under-deliver?)
**Validation Rules:**
- Cannot log negative hours
- Cannot log hours for future months
- Cannot log hours after project status = "Done" (configurable)
---
### 5. Reports & Analytics
**Core Reports:**
| Report | Description | Filters |
|--------|-------------|---------|
| **Forecast Summary** | Multi-period forecast of allocations and revenue | Date range, team, project, status |
| **Utilization Summary** | Team and individual utilization trends | Date range, team member, role |
| **Cost Summary** | Revenue forecasts based on allocations × hourly rates | Date range, project, client |
| **Allocation Report** | Who's allocated to what, month-by-month | Month, team, project |
| **Variance Report** | Planned vs Actual analysis | Date range, project, person |
**Report Features:**
- **Highly customizable filters** (team, person, project, status, date range, type)
- **Export capabilities:** Defer to Phase 2 (PDF/CSV)
- **Caching:** Redis caching for expensive queries
---
### 6. Role-Based Access Control (RBAC)
**Personas & Permissions:**
| Persona | Access Rights | Restrictions |
|---------|---------------|--------------|
| **Superuser** | Full access: setup, config, all projects, all teams | None |
| **Manager** | • Create/edit projects<br>• Allocate resources to own team<br>• View all projects (read-only for other teams)<br>• Approve estimates<br>• View team's utilization reports | • Cannot allocate other teams' members<br>• Cannot edit other managers' projects |
| **Developer** | • View own allocations<br>• Log own hours (actuals)<br>• View project details for assigned projects | • Cannot allocate resources<br>• Cannot change estimates<br>• Cannot view other developers' allocations |
| **Top Brass** | • View all reports (read-only)<br>• Forecast summaries<br>• Utilization dashboards<br>• Cost summaries | • Cannot modify anything<br>• Read-only access only |
**Access Control Implementation:**
- Laravel Policies for model-level authorization
- Middleware for route-level guards
- JWT tokens with role claims
---
## Data Validation Rules
**These rules drive API validation, tests, and verification:**
### Team Members
- Name: Required, max 255 chars
- Role/Team: Required, must exist in master data
- Hourly rate: Required, > 0, numeric (2 decimal places)
- Availability: Must be 0, 0.5, or 1.0
### Projects
- Project ID: Unique, required
- Title: Required, max 255 chars
- Type: Must be "Project" or "Support"
- Status: Must be valid state (see state machine)
- Approved estimate: Required if status ≥ "Estimate Approved", > 0
- Forecasted effort: Sum must equal approved estimate (±5% tolerance)
### Allocations
- Person ID: Must exist in team members
- Project ID: Must exist in projects
- Hours: >= 0, numeric (2 decimal places)
- Month: Valid date (YYYY-MM format)
- Sum of allocations per project ≤ approved estimate + 5%
- Sum of allocations per person ≤ capacity + 20% (warning threshold)
### Actuals
- Person ID: Must exist in team members
- Project ID: Must exist in projects
- Hours: >= 0, numeric (2 decimal places)
- Month: Must be current or past month (cannot log future hours)
- Cannot log hours if project status = "Cancelled" or "Done" (configurable)
### Holidays/PTO
- Date: Valid date
- Type: "Holiday" or "PTO"
- If PTO: must be associated with a team member
---
## Technical Stack
### Backend (Laravel API)
| Component | Technology | Rationale |
|-----------|------------|-----------|
| Framework | Laravel 12 (latest) | Robust PHP framework, rich ecosystem |
| Database | PostgreSQL | Production-grade, ACID compliant, great for reporting |
| Caching | Redis | Query + response caching from day 1 |
| Authentication | JWT (tymon/jwt-auth) | Token-based, suitable for SPA frontend |
| API Design | REST + Laravel API Resources | Standard, well-understood, consistent JSON |
| API Docs | Laravel Scribe (SwaggerUI) | Auto-generated from code comments |
| Testing | PHPUnit (unit) + Pest (feature) | Laravel standard |
| Code Style | PSR-12, Laravel conventions | Industry standard |
| Containerization | Docker (port 3000) | Isolated, reproducible |
| Environment | .env files | Simple configuration management |
### Frontend (SvelteKit)
| Component | Technology | Rationale |
|-----------|------------|-----------|
| Framework | SvelteKit | Modern, reactive, great for dashboards |
| Styling | Tailwind CSS + DaisyUI | Fast development, consistent theming |
| Charts | Recharts | Good balance of power and simplicity |
| Tables | TanStack Table (React Table) | Industry standard, powerful filtering/sorting |
| Forms | Superforms + Zod | Type-safe validation, seamless SvelteKit integration |
| Form Actions | SvelteKit native | Server-side form handling |
| State Management | Svelte stores (minimal) | UI state only (filters, modals) |
| HTTP Client | fetch (native) | No extra dependencies |
| Testing | Vitest (unit) + Playwright (E2E) | Fast, modern testing tools |
| Containerization | Docker (port 5173) | Isolated, hot-reload for dev |
### Infrastructure & Deployment
| Component | Technology | Rationale |
|-----------|------------|-----------|
| Local Dev | Docker Compose | Code-mounted volumes, hot reload |
| Reverse Proxy | Nginx Proxy Manager (existing) | Already running in environment |
| Database Volume | Mounted directory | Portability, easy backup |
| Secrets | .env files (all environments) | Simple, consistent across envs |
| Background Jobs | Laravel Queue + Redis (Phase 2) | Deferred for MVP, easy to add |
---
## Quality Standards & Testing Strategy
### Test Requirements (Per Change)
**Every OpenSpec change must include:**
1. **Unit tests** (backend + frontend)
- Coverage target: >70%
- PHPUnit (Laravel), Vitest (SvelteKit)
2. **E2E tests** (Playwright)
- Happy path + critical error cases
3. **Regression tests**
- Run full test suite on each change
### Code Review Checklist
Before merge, verify:
- **Style:** PSR-12 (PHP), Prettier (JS), ESLint (SvelteKit)
- **Standards:** Laravel conventions, SvelteKit best practices
- **Security:** Input validation, SQL injection prevention, XSS protection, CSRF tokens
- **Tests:** All tests passing, coverage >70%
### Verification Workflow
**`/opsx-verify` must check:**
- All tests passing
- Code coverage >70%
- No uncovered code (files without tests)
- API docs up-to-date (Scribe generation)
- No linting errors
### Commit Standards
- **Granular commits:** One fix = one commit
- **Commit message format:**
```
[Type] Brief description (50 chars max)
Detailed explanation (optional, 72 char wrap)
Refs: #issue-number (if applicable)
```
Types: `feat`, `fix`, `refactor`, `test`, `docs`, `chore`
### Issue-Driven Test Loop (Phase 2)
For E2E/integration failures:
1. Test fails → Create GitHub issue
2. Fix implementation
3. Retest + regression test
4. Close issue when all tests pass
**For MVP:** Run tests, fix inline (no issue creation yet).
---
## Deferred Features (Phase 2+)
### Deferred to Phase 2
| Feature | Rationale for Deferral | Estimated Lift |
|---------|------------------------|----------------|
| **Notifications** (WebSocket) | Allocations are monthly - not time-critical. Users can refresh. | ~6 hours |
| **PDF/CSV Exports** | On-screen reports sufficient for MVP. Easy to add later. | ~4 hours |
| **Background Jobs** (async) | No heavy processing in MVP. Laravel Queue ready when needed. | ~2 hours |
| **Audit Logging** | No compliance requirement for MVP. | ~3 hours |
| **Advanced Caching** (pre-calculated reports) | Start with on-demand queries. Cache if slow. | ~4 hours |
| **API Versioning** (`/api/v1/`) | Not needed until breaking changes. | ~2 hours |
| **Multi-language Support** | English-only for MVP. | ~8 hours |
| **Resource Over-allocation (advanced)** | MVP shows RED flag. Phase 2: predictive warnings, auto-balancing. | ~6 hours |
### Explicitly Out of Scope
| Feature | Why Not Included |
|---------|------------------|
| **Time-tracking tool integration** | Manual entry sufficient. Integration adds vendor lock-in. |
| **Mobile app** | Desktop web app is primary use case. |
| **Invoicing integration** | Billing forecasts only. Actual invoicing is external. |
| **Project task management** | Project-level tracking only, not task-level. |
| **Calendar sync** (Google, Outlook) | Manual PTO/holiday entry is acceptable. |
| **AI-powered forecasting** | Rule-based validation is sufficient for MVP. |
---
## Considerations & Trade-offs
### Decision Log
| Decision | Option Chosen | Alternative Considered | Rationale |
|----------|---------------|------------------------|-----------|
| **Multi-tenancy** | Single-tenant MVP, add `tenant_id` later | Multi-tenant from day 1 | Reduces complexity, easy to add later |
| **Frontend framework** | SvelteKit | Laravel + Vue, React | Modern, reactive, great for dashboards |
| **Authentication** | JWT | Session-based | Suitable for SPA, easier mobile support later |
| **Caching** | Redis from day 1 | Add later if needed | Prevents refactoring technical debt |
| **Notifications** | Defer to Phase 2 | WebSocket PoC in MVP | Not time-critical, saves 6 hours |
| **Exports** | Defer to Phase 2 | Include in MVP | On-screen reports sufficient initially |
| **Issue-driven tests** | Phase 2 | From day 1 | Slower velocity for MVP, add when more tests exist |
| **API versioning** | Not included | `/api/v1/` from start | No breaking changes expected in MVP |
### Known Limitations (MVP)
1. **No real-time updates:** Users must refresh to see allocation changes
2. **Manual time entry:** No automated time-tracking integration
3. **Single organization:** No multi-tenancy support
4. **English only:** No i18n support
5. **No mobile optimization:** Desktop-first design
---
## Success Metrics
### MVP Success Criteria
**Functional Completeness:**
- ✅ Users can define team capacity (members, holidays, PTO, availability)
- ✅ Users can create projects with approved estimates
- ✅ Users can allocate resources to projects month-by-month
- ✅ Users can log actual hours worked
- ✅ System validates allocations (over/under warnings)
- ✅ Users can view 5 core reports (forecast, utilization, cost, allocation, variance)
- ✅ RBAC enforced (4 personas: Superuser, Manager, Dev, Top Brass)
**Quality Metrics:**
- ✅ All tests passing (unit + E2E)
- ✅ Code coverage >70%
- ✅ Zero linting errors
- ✅ API documentation auto-generated (SwaggerUI)
- ✅ Docker Compose setup working (local dev)
**Usability Metrics (Post-Launch):**
- Manager can complete monthly allocation in <30 minutes (vs 2+ hours in spreadsheet)
- Zero billing errors in first 3 months (over/under allocation caught before invoicing)
- 90% of team members log actuals weekly (adoption metric)
### Phase 2 Success Criteria
- ✅ Real-time notifications working (WebSocket)
- ✅ PDF/CSV exports available for all reports
- ✅ Background jobs processing heavy reports
- ✅ Audit logging capturing all changes
---
## Timeline & Phases
### MVP (Phase 1) - Core Functionality
**Target:** 6-8 weeks
**Sprints:**
1. **Project setup** (1 week)
- Docker Compose setup
- Laravel + SvelteKit scaffolding
- Database schema design
- Authentication (JWT)
2. **Capacity planning** (1.5 weeks)
- Team member CRUD
- Holiday/PTO calendar
- Availability tracking
- Capacity calculations
3. **Project management** (1.5 weeks)
- Project CRUD
- Status state machine
- Approved estimate tracking
- Forecasted effort
4. **Resource allocation** (2 weeks)
- Allocation matrix UI
- Validation rules
- Over/under indicators
- Untracked resource bucket
5. **Actuals & reporting** (2 weeks)
- Time logging interface
- Utilization calculations
- 5 core reports
- Filters & customization
6. **Testing & polish** (1 week)
- E2E test coverage
- Code review
- Bug fixes
- Documentation
### Phase 2 - Enhancements
**Target:** 3-4 weeks (post-MVP)
- Notifications (WebSocket)
- Exports (PDF/CSV)
- Background jobs
- Audit logging
- Advanced caching
- Bug fixes from production use
### Phase 3 - Scale & Optimize
**Target:** TBD (based on usage)
- Multi-tenancy
- Mobile optimization
- AI-powered forecasting
- Integration APIs (time-tracking, accounting)
---
## Appendix: Master Data & Taxonomy
**Configurable Lists (Admin-managed):**
1. **Roles/Teams:**
- Frontend Developer
- Backend Developer
- QA Engineer
- DevOps Engineer
- UX Designer
- Project Manager
- Architect
2. **Project Statuses:**
- NA/Support
- Initial
- Gathering Estimates
- Estimate Pending Approval
- Estimate Rework
- Estimate Approved
- Funded
- Scheduled
- In-Progress
- Ready for Prod
- Done
- On-Hold
- Cancelled
3. **Project Types:**
- Project (billable)
- Support (ongoing ops)
4. **Availability Options:**
- 0 (unavailable/PTO)
- 0.5 (half day)
- 1.0 (full day)
5. **Report Filters:**
- Date range (from/to)
- Team member
- Role/Team
- Project
- Project status
- Project type
---
**Document Control:**
- **Owner:** Santhosh J
- **Approver:** Santhosh J
- **Next Review:** Post-MVP completion
- **Change History:**
- v1.0 (2026-02-17): Initial charter approved
---
*End of Project Charter*