address each point.
**Changes Summary**
This specification updates the `headroom-foundation` change set to
include actuals tracking. The new feature adds a `TeamMember` model for
team members and a `ProjectStatus` model for project statuses.
**Summary of Changes**
1. **Add Team Members**
* Created the `TeamMember` model with attributes: `id`, `name`,
`role`, and `active`.
* Implemented data migration to add all existing users as
`team_member_ids` in the database.
2. **Add Project Statuses**
* Created the `ProjectStatus` model with attributes: `id`, `name`,
`order`, and `is_active`.
* Defined initial project statuses as "Initial" and updated
workflow states accordingly.
3. **Actuals Tracking**
* Introduced a new `Actual` model for tracking actual hours worked
by team members.
* Implemented data migration to add all existing allocations as
`actual_hours` in the database.
* Added methods for updating and deleting actual records.
**Open Issues**
1. **Authorization Policy**: The system does not have an authorization
policy yet, which may lead to unauthorized access or data
modifications.
2. **Project Type Distinguish**: Although project types are
differentiated, there is no distinction between "Billable" and
"Support" in the database.
3. **Cost Reporting**: Revenue forecasts do not include support
projects, and their reporting treatment needs clarification.
**Implementation Roadmap**
1. **Authorization Policy**: Implement an authorization policy to
restrict access to authorized users only.
2. **Distinguish Project Types**: Clarify project type distinction
between "Billable" and "Support".
3. **Cost Reporting**: Enhance revenue forecasting to include support
projects with different reporting treatment.
**Task Assignments**
1. **Authorization Policy**
* Task Owner: John (Automated)
* Description: Implement an authorization policy using Laravel's
built-in middleware.
* Deadline: 2026-03-25
2. **Distinguish Project Types**
* Task Owner: Maria (Automated)
* Description: Update the `ProjectType` model to include a
distinction between "Billable" and "Support".
* Deadline: 2026-04-01
3. **Cost Reporting**
* Task Owner: Alex (Automated)
* Description: Enhance revenue forecasting to include support
projects with different reporting treatment.
* Deadline: 2026-04-15
4.8 KiB
description
| description |
|---|
| Archive a completed change in the experimental workflow |
Archive a completed change in the experimental workflow.
Input: Optionally specify a change name after /opsx-archive (e.g., /opsx-archive add-auth). If omitted, check if it can be inferred from conversation context. If vague or ambiguous you MUST prompt for available changes.
Steps
-
If no change name provided, prompt for selection
Run
openspec list --jsonto get available changes. Use the AskUserQuestion tool to let the user select.Show only active changes (not already archived). Include the schema used for each change if available.
IMPORTANT: Do NOT guess or auto-select a change. Always let the user choose.
-
Check artifact completion status
Run
openspec status --change "<name>" --jsonto check artifact completion.Parse the JSON to understand:
schemaName: The workflow being usedartifacts: List of artifacts with their status (doneor other)
If any artifacts are not
done:- Display warning listing incomplete artifacts
- Prompt user for confirmation to continue
- Proceed if user confirms
-
Check task completion status
Read the tasks file (typically
tasks.md) to check for incomplete tasks.Count tasks marked with
- [ ](incomplete) vs- [x](complete).If incomplete tasks found:
- Display warning showing count of incomplete tasks
- Prompt user for confirmation to continue
- Proceed if user confirms
If no tasks file exists: Proceed without task-related warning.
-
Assess delta spec sync state
Check for delta specs at
openspec/changes/<name>/specs/. If none exist, proceed without sync prompt.If delta specs exist:
- Compare each delta spec with its corresponding main spec at
openspec/specs/<capability>/spec.md - Determine what changes would be applied (adds, modifications, removals, renames)
- Show a combined summary before prompting
Prompt options:
- If changes needed: "Sync now (recommended)", "Archive without syncing"
- If already synced: "Archive now", "Sync anyway", "Cancel"
If user chooses sync, use Task tool (subagent_type: "general-purpose", prompt: "Use Skill tool to invoke openspec-sync-specs for change ''. Delta spec analysis: "). Proceed to archive regardless of choice.
- Compare each delta spec with its corresponding main spec at
-
Perform the archive
Create the archive directory if it doesn't exist:
mkdir -p openspec/changes/archiveGenerate target name using current date:
YYYY-MM-DD-<change-name>Check if target already exists:
- If yes: Fail with error, suggest renaming existing archive or using different date
- If no: Move the change directory to archive
mv openspec/changes/<name> openspec/changes/archive/YYYY-MM-DD-<name> -
Display summary
Show archive completion summary including:
- Change name
- Schema that was used
- Archive location
- Spec sync status (synced / sync skipped / no delta specs)
- Note about any warnings (incomplete artifacts/tasks)
Output On Success
## Archive Complete
**Change:** <change-name>
**Schema:** <schema-name>
**Archived to:** openspec/changes/archive/YYYY-MM-DD-<name>/
**Specs:** ✓ Synced to main specs
All artifacts complete. All tasks complete.
Output On Success (No Delta Specs)
## Archive Complete
**Change:** <change-name>
**Schema:** <schema-name>
**Archived to:** openspec/changes/archive/YYYY-MM-DD-<name>/
**Specs:** No delta specs
All artifacts complete. All tasks complete.
Output On Success With Warnings
## Archive Complete (with warnings)
**Change:** <change-name>
**Schema:** <schema-name>
**Archived to:** openspec/changes/archive/YYYY-MM-DD-<name>/
**Specs:** Sync skipped (user chose to skip)
**Warnings:**
- Archived with 2 incomplete artifacts
- Archived with 3 incomplete tasks
- Delta spec sync was skipped (user chose to skip)
Review the archive if this was not intentional.
Output On Error (Archive Exists)
## Archive Failed
**Change:** <change-name>
**Target:** openspec/changes/archive/YYYY-MM-DD-<name>/
Target archive directory already exists.
**Options:**
1. Rename the existing archive
2. Delete the existing archive if it's a duplicate
3. Wait until a different date to archive
Guardrails
- Always prompt for change selection if not provided
- Use artifact graph (openspec status --json) for completion checking
- Don't block archive on warnings - just inform and confirm
- Preserve .openspec.yaml when moving to archive (it moves with the directory)
- Show clear summary of what happened
- If sync is requested, use the Skill tool to invoke
openspec-sync-specs(agent-driven) - If delta specs exist, always run the sync assessment and show the combined summary before prompting