Allocation Indicators Specification
Overview
This capability defines low-noise variance indicators for planning and execution surfaces. Indicators are decision aids, not decorative status coloring.
ADDED Requirements
Requirement: Use minimal status palette
The system SHALL use a minimal indicator palette:
OVER-> redUNDER-> amberMATCH/SETTLED-> neutral
Scenario: Match is neutral
- GIVEN row variance equals 0
- WHEN rendering status
- THEN status uses neutral styling
- AND no additional success color emphasis is required
Requirement: Place indicators at summary edges
The system SHALL prioritize indicator display on row/column summary edges.
Scenario: Row-level over-allocation indicator
- GIVEN project row total exceeds selected month plan
- WHEN allocation grid renders
- THEN project row summary status shows
OVERin red
Scenario: Column-level over-capacity indicator
- GIVEN member column total exceeds member month capacity
- WHEN allocation grid renders
- THEN member column summary status shows
OVERin red
Scenario: Under-allocation indicator
- GIVEN row or column total is below comparison target
- WHEN grid renders
- THEN summary status shows
UNDERin amber
Requirement: Keep indicators explainable
The system SHALL provide text status labels with numeric deltas for accessibility and clarity.
Scenario: Color is not sole signal
- WHEN status is rendered
- THEN UI includes text label (
OVER/UNDER) and delta value
Requirement: Distinguish project and resource variance semantics
Project variance and resource variance SHALL remain separate.
Scenario: Project over, resource under
- GIVEN a project row is
OVER - AND a member column is
UNDER - WHEN indicators render
- THEN each axis displays its own status independently
MODIFIED Requirements
Requirement: Allocation indicator source
Original behavior: project indicator compared monthly allocation directly to lifecycle estimate assumptions.
Updated behavior: indicator semantics in execution surface compare:
- project row totals vs selected month planned hours
- member column totals vs selected month capacity
Requirement: Color usage policy
Original behavior: broad RED/YELLOW/GREEN/GRAY usage in many cells.
Updated behavior: minimal red/amber/neutral policy with status emphasis on summary edges.