## ADDED Requirements
### Requirement: Calculate running utilization
The system SHALL calculate running utilization as (Allocated hours YTD) / (Capacity YTD) × 100%.
#### Scenario: Calculate YTD utilization in March
- **WHEN** a team member has capacity: Jan 160h, Feb 160h, Mar 160h (YTD total: 480h)
- **AND** the team member has allocations: Jan 140h, Feb 150h, Mar 160h (YTD total: 450h)
- **THEN** the system calculates running utilization as 93.75% (450 / 480 × 100%)
#### Scenario: Running utilization at start of year
- **WHEN** calculating running utilization in January
- **AND** the team member has capacity of 160h and allocations of 120h
- **THEN** the system calculates running utilization as 75% (120 / 160 × 100%)
### Requirement: Calculate overall utilization
The system SHALL calculate overall utilization as (Allocated hours this month) / (Capacity this month) × 100%.
#### Scenario: Calculate monthly utilization
- **WHEN** a team member has capacity of 160 hours for February
- **AND** the team member has total allocations of 140 hours for February
- **THEN** the system calculates overall utilization as 87.5% (140 / 160 × 100%)
#### Scenario: Full utilization
- **WHEN** a team member has capacity of 160 hours
- **AND** allocations of exactly 160 hours
- **THEN** the system calculates overall utilization as 100%
#### Scenario: Over-utilization
- **WHEN** a team member has capacity of 160 hours
- **AND** allocations of 180 hours
- **THEN** the system calculates overall utilization as 112.5% (180 / 160 × 100%)
### Requirement: Display utilization alongside capacity
The system SHALL display utilization percentages alongside capacity information in the allocation view.
#### Scenario: Display capacity with utilization
- **WHEN** viewing the allocation matrix for a team member
- **THEN** the system displays capacity (e.g., "160h")
- **AND** displays overall utilization percentage (e.g., "87.5%")
- **AND** displays running utilization percentage (e.g., "YTD: 93.75%")
### Requirement: Color-code utilization levels
The system SHALL use color coding to indicate utilization levels.
#### Scenario: Low utilization
- **WHEN** overall utilization is below 70%
- **THEN** the system displays the utilization in BLUE or GRAY (underutilized)
#### Scenario: Optimal utilization
- **WHEN** overall utilization is between 80% and 100%
- **THEN** the system displays the utilization in GREEN (optimal)
#### Scenario: High utilization
- **WHEN** overall utilization is between 100% and 110%
- **THEN** the system displays the utilization in YELLOW (caution)
#### Scenario: Over-utilization
- **WHEN** overall utilization exceeds 110%
- **THEN** the system displays the utilization in RED (over-allocated)
### Requirement: Calculate team-level utilization
The system SHALL calculate average utilization across all team members.
#### Scenario: Calculate team average utilization
- **WHEN** Team Member A has 87.5% utilization
- **AND** Team Member B has 93.75% utilization
- **AND** Team Member C has 75% utilization
- **THEN** the system calculates team average utilization as 85.4% ((87.5 + 93.75 + 75) / 3)
#### Scenario: Exclude inactive team members from team utilization
- **WHEN** calculating team-level utilization
- **AND** one team member is inactive
- **THEN** the system excludes the inactive team member from the average
### Requirement: Track utilization trends over time
The system SHALL provide historical utilization data for trend analysis.
#### Scenario: View utilization trend for 6 months
- **WHEN** viewing a team member's utilization history from January to June
- **THEN** the system displays monthly utilization percentages for each month
- **AND** the system shows a trend line or chart indicating increasing/decreasing utilization
### Requirement: Compare allocated vs actual utilization
The system SHALL calculate actual utilization based on logged hours for comparison with planned utilization.
#### Scenario: Calculate actual utilization
- **WHEN** a team member had 140 hours allocated (planned utilization: 87.5%)
- **AND** the team member logged 130 hours actual (actual utilization: 81.25%)
- **THEN** the system displays both planned and actual utilization side by side
- **AND** the system shows variance of -6.25 percentage points