2.4 KiB
2.4 KiB
Context
The codebase has grown across frontend UX, backend ingestion, translations, analytics, and admin tooling. Quality checks are currently ad hoc and mostly manual, creating regression risk. A single cross-layer test and observability program is needed to enforce predictable release quality.
Goals / Non-Goals
Goals:
- Establish CI quality gates covering unit, integration, E2E, accessibility, security, and performance.
- Provide deterministic test fixtures for UI/API/DB workflows.
- Define explicit coverage targets for critical paths and edge cases.
- Add production monitoring and alerting for latency, failures, and freshness.
Non-Goals:
- Migrating the app to a different framework.
- Building a full SRE platform from scratch.
- Replacing existing business logic outside remediation findings.
Decisions
Decision 1: Layered test pyramid with release gates
Adopt unit + integration + E2E layering; block release when any gate fails.
Decision 2: Deterministic test data contracts
Use seeded fixtures and mockable provider boundaries for repeatable results.
Decision 3: Accessibility and speed as first-class CI checks
Treat WCAG and page-speed regressions as gate failures with explicit thresholds.
Decision 4: Security checks split by class
Run dependency audit, static security lint, and API abuse smoke tests separately for clearer ownership.
Decision 5: Monitoring linked to user-impacting SLOs
Alert on API error rate, response latency, scheduler freshness, and failed fetch cycles.
Risks / Trade-offs
- [Risk] Longer CI times -> Mitigation: split fast/slow suites, parallelize jobs.
- [Risk] Flaky E2E tests -> Mitigation: stable fixtures, retry policy only for known transient failures.
- [Risk] Alert fatigue -> Mitigation: tune thresholds with burn-in period and severity levels.
Migration Plan
- Baseline current test/tooling and add missing framework dependencies.
- Implement layered suites and CI workflow stages.
- Add WCAG, speed, and security checks with thresholds.
- Add monitoring dashboards and alert routes.
- Run remediation sprint for failing gates.
Rollback:
- Keep non-blocking mode for new gates until stability criteria are met.
Open Questions
- Which minimum coverage threshold should be required for merge (line/branch)?
- Which environments should execute full E2E and speed checks (PR vs nightly)?