ADDED Requirements
Requirement: Calculate running utilization
The system SHALL calculate running utilization as (Allocated hours YTD) / (Capacity YTD) × 100%.
Scenario: Calculate YTD utilization in March
- WHEN a team member has capacity: Jan 160h, Feb 160h, Mar 160h (YTD total: 480h)
- AND the team member has allocations: Jan 140h, Feb 150h, Mar 160h (YTD total: 450h)
- THEN the system calculates running utilization as 93.75% (450 / 480 × 100%)
Scenario: Running utilization at start of year
- WHEN calculating running utilization in January
- AND the team member has capacity of 160h and allocations of 120h
- THEN the system calculates running utilization as 75% (120 / 160 × 100%)
Requirement: Calculate overall utilization
The system SHALL calculate overall utilization as (Allocated hours this month) / (Capacity this month) × 100%.
Scenario: Calculate monthly utilization
- WHEN a team member has capacity of 160 hours for February
- AND the team member has total allocations of 140 hours for February
- THEN the system calculates overall utilization as 87.5% (140 / 160 × 100%)
Scenario: Full utilization
- WHEN a team member has capacity of 160 hours
- AND allocations of exactly 160 hours
- THEN the system calculates overall utilization as 100%
Scenario: Over-utilization
- WHEN a team member has capacity of 160 hours
- AND allocations of 180 hours
- THEN the system calculates overall utilization as 112.5% (180 / 160 × 100%)
Requirement: Display utilization alongside capacity
The system SHALL display utilization percentages alongside capacity information in the allocation view.
Scenario: Display capacity with utilization
- WHEN viewing the allocation matrix for a team member
- THEN the system displays capacity (e.g., "160h")
- AND displays overall utilization percentage (e.g., "87.5%")
- AND displays running utilization percentage (e.g., "YTD: 93.75%")
Requirement: Color-code utilization levels
The system SHALL use color coding to indicate utilization levels.
Scenario: Low utilization
- WHEN overall utilization is below 70%
- THEN the system displays the utilization in BLUE or GRAY (underutilized)
Scenario: Optimal utilization
- WHEN overall utilization is between 80% and 100%
- THEN the system displays the utilization in GREEN (optimal)
Scenario: High utilization
- WHEN overall utilization is between 100% and 110%
- THEN the system displays the utilization in YELLOW (caution)
Scenario: Over-utilization
- WHEN overall utilization exceeds 110%
- THEN the system displays the utilization in RED (over-allocated)
Requirement: Calculate team-level utilization
The system SHALL calculate average utilization across all team members.
Scenario: Calculate team average utilization
- WHEN Team Member A has 87.5% utilization
- AND Team Member B has 93.75% utilization
- AND Team Member C has 75% utilization
- THEN the system calculates team average utilization as 85.4% ((87.5 + 93.75 + 75) / 3)
Scenario: Exclude inactive team members from team utilization
- WHEN calculating team-level utilization
- AND one team member is inactive
- THEN the system excludes the inactive team member from the average
Requirement: Track utilization trends over time
The system SHALL provide historical utilization data for trend analysis.
Scenario: View utilization trend for 6 months
- WHEN viewing a team member's utilization history from January to June
- THEN the system displays monthly utilization percentages for each month
- AND the system shows a trend line or chart indicating increasing/decreasing utilization
Requirement: Compare allocated vs actual utilization
The system SHALL calculate actual utilization based on logged hours for comparison with planned utilization.
Scenario: Calculate actual utilization
- WHEN a team member had 140 hours allocated (planned utilization: 87.5%)
- AND the team member logged 130 hours actual (actual utilization: 81.25%)
- THEN the system displays both planned and actual utilization side by side
- AND the system shows variance of -6.25 percentage points