Archive three completed changes to archive/:
- api-resource-standard (70 tasks, 14 resource classes)
- capacity-expert-mode (68 tasks, expert mode planning grid)
- enhanced-allocation (62 tasks, planning fidelity + reporting)

Sync all delta specs to main specs/:
- api-resource-standard: API response standardization
- capacity-expert-mode: Expert mode toggle, grid, KPIs, batch API
- resource-allocation: Month execution comparison, bulk, untracked
- untracked-allocation: Null team member support
- allocation-indicators: Variance indicators (red/amber/neutral)
- monthly-budget: Explicit project-month planning

All changes verified and tested (157 tests passing).
2026-03-08 19:13:28 -04:00

3.5 KiB

Proposal: Enhanced Allocation Fidelity

Why

The current Resource Allocation implementation diverges from intended planning behavior and creates misleading month-level signals.

Current drift:

  1. Monthly budget was treated as a derived display (approved_estimate / 12) rather than explicit manager planning.
  2. Allocation execution and planning intent are conflated in one surface.
  3. Visual signaling is noisier than needed for decision-making.
  4. Untracked allocation and partial bulk semantics are only partially implemented.

Business need:

  • Managers must phase a project lifecycle estimate across months based on dependencies and customer timelines.
  • Month execution must be validated against explicit month plans, not an average split.
  • Management needs deterministic reporting from a strict plan -> execute chain.

What Changes

This change formalizes and aligns a strict 3-surface model (with reporting as the 4th outcome surface):

  1. Projects (Lifecycle Total)

    • approved_estimate remains the project-level lifecycle cap.
  2. Project-Month Plan (Manager Intent)

    • Manager enters monthly planned hours per project in a grid.
    • Monthly plans reconcile against lifecycle total (OVER/UNDER/MATCH).
    • Blank planning months remain blank in UI.
  3. Project-Resource Allocation (Month Execution)

    • Allocation grid becomes primary editing workflow (no modal-first dependency).
    • Row variance compares month allocation vs project month plan.
    • Column variance compares member allocation vs member month capacity.
    • Untracked (team_member_id = null) is supported as a first-class execution path.
  4. Reporting Outcome

    • Reporting consumes lifecycle total + month plan + resource allocation to show did/is/will views.

Capability Changes

New / Expanded Capabilities

  • monthly-budget (reframed as project-month planning)
  • allocation-indicators (minimal, edge-focused variance signaling)
  • untracked-allocation (null team member end-to-end semantics)

Modified Capability

  • resource-allocation (partial bulk success, month-plan-aware variance)

Key Rules Locked by This Change

  1. No approved_estimate / 12 derivation for planning behavior.
  2. Month plan reconciliation is explicit:
    • sum(plan) > approved -> OVER
    • sum(plan) < approved -> UNDER
    • sum(plan) == approved -> MATCH
  3. Blank planning month is visually blank, but treated as planned 0 for allocation variance.
  4. Allocation for blank-plan months is allowed.
  5. projects.forecasted_effort is deprecated for this workflow.
  6. Visual language is minimal:
    • OVER = red
    • UNDER = amber
    • MATCH = neutral

Impact

Data Model

  • Introduce explicit project-month planning source of truth.
  • Stop using projects.forecasted_effort in this workflow path.

API Contract

  • Add/adjust project-month plan endpoints and payloads.
  • Ensure allocation endpoints provide enough context for row/column variance.
  • Keep partial bulk response contract explicit (created/failed/summary).

Frontend

  • Add project-month plan grid surface.
  • Refactor allocation matrix to grid-first editing and edge variance indicators.
  • Keep status placement low-noise and decision-oriented.

Testing

  • Add deterministic coverage for reconciliation math, blank-vs-zero semantics, untracked handling, and partial bulk behavior.
  • Require mapped tests for every requirement scenario before task closure.

Non-Goals

  • Real-time collaboration/websockets in this change.
  • Notification systems.
  • Export workflows.
  • UI polish iterations beyond required planning fidelity.